Is your analytical instrument still acting up, even after receiving preventative maintenance (PM)? Problems after preventative maintenance can happen even when every check passes, because a PM shows only that the instrument met a checklist on one day. This blog covers four reasons they show up and what an independent service provider does to find the cause.
Preventative maintenance shows that the instrument met a checklist’s criteria at a single point in time. It does not show how the instrument holds up under a full workload, so problems can persist. The provider sets the checklist for each instrument, and anything it leaves off goes unchecked, which can lead to recurring instrument failure even after service. Some problems will show up after any PM, so the question is how fast someone finds the cause.
Here are four common scenarios, from gaps in the checklist to changes at the visit or in the lab that read as instrument faults.
Reason 1: The Check Ran Under Conditions Your Methods Don’t Use
The PM check has to be repeatable, so it runs a clean standard under fixed conditions. A pass shows the instrument meets its criteria on that standard. It doesn’t show how the instrument handles the samples you actually run.
Your methods use their own flow rates, temperatures and settings, and your samples carry matrices and contaminants that a clean standard doesn’t. Contaminants can suppress signal or raise background, and a clean standard won’t reveal either. You only see the effect when your own samples run.
READ MORE: What’s Included in an Analytical Instrument Maintenance Service Contract?
Reason 2: A Marginal Fault Passed a Short Check
The PM check is also short. A fault that comes and goes can sit out a check of a few injections, then show up partway through a full sequence of your samples. Running your own method may be what finally catches the fault.
Wear hides the same way. Acceptance criteria set a pass line, and a worn part can sit just above it on test day. Under a full workload, the same part can fall below that line within days.
READ MORE: How a Lab Instrument Maintenance Plan Catches What PM Misses
Reason 3: The Service Visit Changed the Instrument
Sometimes it’s not about the service checklist but rather what the service itself changed about the instrument.
Reassembly and Conditioning
An instrument that comes apart has to go back together exactly, and a fitting that isn’t fully seated can leak or leave dead volume where sample collects. New columns, loops and other flow-path parts can also adsorb analyte on active sites during the first runs, which looks like lost sensitivity until the parts are conditioned.
Tuning and Calibration
New parts may require a new tune or calibration, and a calibration is only as good as the solution used to run it. A contaminated or degraded calibrant can produce a calibration that passes but skews your data, so the report looks fine while your results are off.
READ MORE: Why You Need Both LC-MS Calibration & Tuning
Reason 4: Something Outside the Instrument Changed
Preventative maintenance covers the instrument, but instruments don’t exist in a vacuum. If the lab it sits in changes, the instrument can be disrupted. For example:
- Power sags and transients can disrupt a run
- A gas supply that runs low over a weekend can contaminate the system and raise baseline noise on the next runs
- A new mobile phase batch or an aging column can shift baselines and retention times
- Software updates or network faults on the acquisition PC can read as hardware trouble
What an Independent Service Provider Does Differently
Some of these problems will still happen after a PM. What an independent provider changes is how fast the cause gets found and who you talk to when it does. It works across manufacturers instead of following one manufacturer’s checklist, so the engineer can look at the whole system, from the instrument to the lab around it.
Troubleshoot to the Root Cause
When something acts up after a PM, the useful step is to diagnose it back to its root cause. An engineer looks into the instrument and your data to find out why the problem is happening, then troubleshoots from there. A checklist can rule out causes. Understanding how your system runs is what finds the one that remains.
Document and Verify the Work
Recording as-found and as-left data shows what each adjustment changed, so you can trace a later problem to a specific step. Before sign-off, the engineer can confirm the work with fresh calibrant and a conditioned column.
Check the Surroundings and Keep One Record
Checking gas supply, power and the acquisition PC during the visit rules out outside causes before anyone blames the instrument. Keeping one record from visit to visit shows what has changed since the last time the instrument ran well.
A system suitability injection logged over time can show whether performance dropped at a specific point or has been drifting.
Reach an Engineer Who Knows Your System
Problems that show up after a PM get solved faster when you can reach an engineer who already knows your system. That engineer can get on a remote call, look at what you are seeing, and narrow down what changed. Talking to a different person each time about the same instrument keeps you going in loops, because none of them know its history.
READ MORE: What Your GC-MS Symptoms Mean and Why You Could Be Looking in the Wrong Place
Conclusion
A passed PM is easy to read as proof that the instrument is fine. It shows the instrument met a checklist on one day, and some problems will show up afterward no matter who did the service. Before the next PM, ask your provider what the checklist leaves out and who you can call when something looks off.
Innovative Lab Services (ILS) is an independent provider of preventative maintenance and analytical instrument repair for LC-MS, GC-MS, HPLC, and GC systems from major manufacturers. ILS engineers diagnose problems to their root cause, and you can get on a remote call with an engineer who knows your system. Because the same team handles both maintenance and repair, each visit adds to one service record, so the next engineer starts with what the last one found.
Did a problem return after a PM that passed? Contact ILS to talk through the service report and what you’re still seeing.